The ground floor area and the upstairs of the house are currently being heated for an energy consumption of only 1.45kw (February 2008).
Access to the site where the water battery and heat will be located is not possible at the moment and so we are currently having to heat the house using low level heating. Once the groundworks have been backfilled, we will be able to erect the two new technologies along with the wind turbine and storage.